Resource
| Id | DNase-seq/ENCSR960EVM |
|---|---|
| Type | position_score |
| Version | 0 |
| Summary | DNase-seq ENCSR960EVM [biosample_summary="Homo sapiens stimulated activated CD8-positive, alpha-beta memory T cell female adult (33 years) treated with anti-CD3 and anti-CD28 coated beads for 48 hours, 100 ng/mL Interleukin-4 for 48 hours"] |
| Description |
status: released biological_replicates: Rep 1 summary: female adult (33 years) treated with anti-CD3 and anti-CD28 coated beads for 48 hours, 100 ng/mL Interleukin-4 for 48 hours output_type: peaks audit_warning: Alignment file {ENCFF074VBQ|/files/ENCFF074VBQ/} processed by DNase-seq ENCODE4 v3.0.0-alpha.2 GRCh38 pipeline ( {ENCPL848KLD|/pipelines/ENCPL848KLD/} ) for GRCh38 assembly has 32877100 mapped reads. According to ENCODE standards, conventional DNase-seq profile requires a minimum of 20 million uniquely mapped reads to generate a reliable SPOT (Signal Portion of Tags) score. The recommended value is > 50 million. For deep, foot-printing depth DNase-seq 150-200 million uniquely mapped reads are recommended. (See {ENCODE DNase-seq data standards|/data-standards/dnase-seq-encode4/}) |
| Labels |
|
Scores (1)
| ID | Type | Default annotation | Description | Histogram | Range | Summary |
|---|---|---|---|---|---|---|
| DNase-seq_ENCSR960EVM | float |
DNase-seq_ENCSR960EVM |
DNase-seq ENCSR960EVM [biosample_summary="Homo sapiens stimulated activated CD8-positive, alpha-beta memory T cell female adult (33 years) treated with anti-CD3 and anti-CD28 coated beads for 48 hours, 100 ng/mL Interleukin-4 for 48 hours"]
|
![]() |
[0.397, 53.5] |
|
n counts base pairs; sd is the population standard deviation.
Coverage
| Chromosome | Covered positions | Covered % | Segments |
|---|---|---|---|
| all chromosomes | 8705215 | 0.27% | 43907 |
| chr1 | 872340 | 0.35% | 4400 |
| chr2 | 624646 | 0.26% | 3178 |
| chr3 | 485977 | 0.25% | 2465 |
| chr4 | 299840 | 0.16% | 1501 |
| chr5 | 392394 | 0.22% | 1987 |
| chr6 | 524041 | 0.31% | 2613 |
| chr7 | 397044 | 0.25% | 2011 |
| chr8 | 322873 | 0.22% | 1654 |
| chr9 | 356731 | 0.26% | 1824 |
| chr10 | 384428 | 0.29% | 1971 |
| chr11 | 434860 | 0.32% | 2209 |
| chr12 | 452901 | 0.34% | 2269 |
| chr13 | 169926 | 0.15% | 830 |
| chr14 | 293640 | 0.27% | 1486 |
| chr15 | 292624 | 0.29% | 1507 |
| chr16 | 369490 | 0.41% | 1840 |
| chr17 | 514912 | 0.62% | 2571 |
| chr18 | 141478 | 0.18% | 726 |
| chr19 | 569178 | 0.97% | 2757 |
| chr20 | 247182 | 0.38% | 1277 |
| chr21 | 99812 | 0.21% | 512 |
| chr22 | 206875 | 0.41% | 1040 |
| chrX | 252023 | 0.16% | 1279 |
| 3343 contigs with no values (186304500 bp) | 0 | 0.00% | 0 |
Segment lengths
| segments | min | max | mean | median | |
|---|---|---|---|---|---|
| segments | 43907 | 1 | 796 | 198.26 | 200 |
Files
| Filename | Size | md5 |
|---|---|---|
| ENCFF559YDV.bed.gz | 479.04 KB | ab5d4e62f88000ddff87921b19c87179 |
| ENCFF559YDV.tabix.bed.gz | 430.94 KB | 101a382416e1c7e057598b41fe7895ae |
| ENCFF559YDV.tabix.bed.gz.tbi | 228.57 KB | f0165095e6f5d3b45dd3f8508667beb4 |
| genomic_resource.yaml | 2.47 KB | 2ba5ae44c02d1f0ee63206e87340cc8d |
| statistics/ |
